1. Home
  2. LC guides
  3. UCP 600 key articles explained

UCP 600 Explained: Presentation Periods, Tolerances and Refusal Rules in Plain English

When a bank says your documents have a “discrepancy”, the rulebook behind that call is UCP 600. It has 39 articles, but only a dozen or so come up regularly in day-to-day export work. This guide picks out the articles you will meet most often and explains them in plain language with real examples, so you can follow the bank's examination logic and know where your rights lie.

LCFlow AI editorial team · Updated · 12 min read

What UCP 600 and ISBP 821 are

  • UCP 600: the Uniform Customs and Practice for Documentary Credits issued by the International Chamber of Commerce (ICC), in force since July 1, 2007, with 39 articles. When field 40E of an L/C reads “UCP LATEST VERSION”, UCP 600 applies.
  • ISBP 821: the International Standard Banking Practice published by the ICC in 2023. UCP 600 sets out principles; ISBP turns them into concrete examination standards for each type of document, such as which differences are acceptable on an invoice, a bill of lading or an insurance policy.

Keep in mind that UCP 600 is a set of rules the parties agree to adopt, not a law. The terms of the L/C can exclude or modify UCP rules, so when examining documents it is always “L/C terms first, UCP fills the gaps”.

Two core principles: independence and documents only

  • Independence (Article 4): the letter of credit and the sales contract are separate. Whatever the contract says, the bank pays only according to the terms of the credit. So if the contract and the L/C don't match, ask your buyer to amend the L/C before you ship.
  • Documents only (Article 5): banks deal with documents, not goods. However good the goods are, non-complying documents can still be refused; and the other way round, if the documents comply, the bank must pay.

Article 3: how date terms are interpreted

Term in the L/CHow UCP 600 reads it
on or about5 calendar days before until 5 calendar days after the stated date, both dates included
to, until, till, from, between (for a shipment period)Includes the date mentioned
before, afterExcludes the date mentioned
from, after (for a maturity date)Excludes the date mentioned
first half / second half1st–15th / 16th–last day of the month
beginning / middle / end1st–10th / 11th–20th / 21st–last day of the month

Article 14: standard for examining documents

Article 14 is the heart of the rules. It sets out how banks examine documents:

  • (a): banks decide whether a presentation is complying on the basis of the documents alone, on their face.
  • (b): banks have a maximum of five banking days following the day of presentation to examine the documents.
  • (c): a presentation including original transport documents must be made within 21 calendar days after the date of shipment, and never later than the expiry date of the credit.
  • (d): data in a document need not be identical to the L/C or to other documents, but must not conflict. This is the key test for consistency between documents.
  • (e): in documents other than the commercial invoice, the goods may be described in general terms, as long as they don't conflict with the L/C.
  • (f): for a document where the L/C doesn't specify the issuer or content, the bank accepts it as long as it appears to fulfil the function of that document.
  • (g): documents the L/C doesn't call for are disregarded.
  • (h): if the L/C states a condition without requiring a document to show it (a non-documentary condition), the bank treats it as not stated.
  • (i): a document may be dated before the L/C issuance date, but not later than the date of presentation.
  • (j): the addresses of the beneficiary and the applicant need not match the L/C, but must be in the same country; phone numbers and email addresses need not match. Exception: when the applicant's details appear in the consignee or notify party field of a transport document, they must match the L/C.
  • (k): the shipper need not be the beneficiary.

Article 16: discrepancies and refusal

Article 16 governs what a bank can do when it finds discrepancies, and how it must do it. For exporters, it is an important safeguard:

  • When a bank determines that a presentation does not comply, it may refuse to honour or negotiate.
  • The issuing bank may, at its own discretion, ask the applicant whether it will waive the discrepancies, but this does not extend the five-banking-day period.
  • When it decides to refuse, the bank must send a single notice before the close of the fifth banking day, listing every discrepancy and stating what it is doing with the documents, for example holding them pending further instructions or returning them.
  • A bank that fails to give notice as required can no longer claim the documents are non-complying.

Practical tip: when you receive a notice of refusal from an overseas bank, first check whether it arrived in time and whether it lists all discrepancies in one notice. If the bank broke the procedure in Article 16, the exporter has solid grounds to demand payment. At that point it is best to ask your negotiating bank to help.

Articles 17 & 18: originals, copies and the commercial invoice

Article 17: originals and copies

  • At least one original of each document required by the L/C must be presented.
  • A document bearing an apparently original signature, mark or stamp, or marked “ORIGINAL”, is normally treated as an original.
  • When multiple copies are required, such as “IN DUPLICATE”, presenting one original and the rest as copies is enough, unless the document itself indicates otherwise.

Article 18: commercial invoice

  • Issued by the beneficiary, made out in the name of the applicant, in the same currency as the L/C, and need not be signed.
  • The description of the goods must correspond with the L/C. This is stricter than the “no conflict” standard for other documents.
  • If the invoice amount exceeds what the L/C allows, the bank may refuse it; if it accepts, it will only pay up to the L/C amount.

Articles 20, 27 & 28: bills of lading and insurance

Article 20: bill of lading

  • Shows the name of the carrier and is signed by the carrier, the master, or an agent on their behalf.
  • Indicates that the goods have been shipped on board a named vessel at the port of loading stated in the L/C, by pre-printed wording or an on-board notation.
  • Shows shipment from the port of loading to the port of discharge stated in the L/C.
  • Is presented as a sole original or, if issued in more than one original, the full set as indicated on the bill of lading.
  • Must not indicate that it is subject to a charter party; charter party bills of lading are covered by Article 22.

Article 27: clean transport document

Banks only accept clean transport documents, meaning ones with no clause declaring a defective condition of the goods or their packaging. The word “CLEAN” does not need to appear on the bill of lading, even if the L/C asks for “CLEAN ON BOARD”.

Article 28: insurance document

  • Issued by an insurance company or its agent; cover notes are not accepted.
  • The insurance date must not be later than the date of shipment, unless the policy shows that cover is effective from no later than the shipment date.
  • If the L/C doesn't state the insured amount, the minimum is 110% of the CIF or CIP value, in the same currency as the L/C.

Articles 29–32: deadlines, tolerances and partial shipments

Article 29: extension for bank holidays

If the expiry date or the last day for presentation falls on a day the bank is closed, it is extended to the next banking day. However, the latest date for shipment is not extended.

Article 30: tolerance in quantity and amount

SituationTolerance allowed
“about” or “approximately” appears before the amount, quantity or unit priceThat item may be 10% more or less
Quantity is not stated in packing units or individual items (e.g. metric tons), and the total drawing does not exceed the L/C amountQuantity may be 5% more or less
The full quantity in the L/C has been shipped and the unit price has not been reduced, or the quantity is not subject to Article 30(b)The amount drawn may be up to 5% less than the L/C amount

Article 31: partial drawings and partial shipments

  • Partial drawings or partial shipments are allowed unless the L/C prohibits them.
  • Goods carried on the same means of conveyance and the same journey to the same destination are not treated as a partial shipment, even if the shipment dates or ports of loading differ.

Article 32: instalment shipments

When the L/C calls for drawings or shipments by instalments within set periods, and any instalment is not made within its period, the credit ceases to be available for that instalment and all later ones. With an instalment L/C, plan your shipping schedule carefully.

The discrepancies these articles most often cause in practice are covered in the 10 most common L/C discrepancies; for how to check an L/C field by field when you receive it, see how to review an L/C and MT700 fields.

FAQ

Is UCP 600 a law?

No. UCP 600 is a set of private rules issued by the International Chamber of Commerce (ICC), in force since July 1, 2007. It only binds the parties when the letter of credit says it applies (usually by stating UCP LATEST VERSION in field 40E). Its force comes from the parties' agreement, so the terms of the L/C can exclude or modify any of its rules.

What is the difference between UCP 600 and ISBP 821?

UCP 600 sets out the basic rules for letters of credit and is written as general principles. ISBP 821 is the International Standard Banking Practice published by the ICC in 2023. It turns the principles of UCP 600 into concrete examination standards for each type of document, such as which differences are acceptable on an invoice, a bill of lading or an insurance policy. Banks refer to both when examining documents.

If the L/C says “on or about” a certain date, which days does that cover?

Under UCP 600 Article 3, “on or about” means a period of five calendar days before until five calendar days after the stated date, with both start and end dates included. For example, on or about October 15 covers October 10 through October 20.

Once a bank finds discrepancies, can it notify them in several rounds?

No. Under UCP 600 Article 16, a bank that decides to refuse must list all discrepancies in a single notice of refusal, given no later than the close of the fifth banking day following the day of presentation. Discrepancies found afterwards cannot be used to refuse, and a bank that fails to give notice as required cannot claim the documents are non-complying.

If the L/C says nothing about partial shipments, are they allowed?

Yes. Under UCP 600 Article 31(a), partial drawings or partial shipments are allowed unless the credit prohibits them. If field 43P says NOT ALLOWED, you cannot ship in parts. Also, goods carried on the same means of conveyance and the same journey are not treated as a partial shipment, even if the bills of lading show different shipment dates or ports of loading.

This guide is general practical information based on UCP 600 and ISBP 821, not legal or financial advice. The bank's examination and the terms of your letter of credit always prevail.